Bathrooms
Update the Bath to Fit with the Library
We had completed a library project for this homeowner years ago. Now it was time to bring the adjoining bathroom up to the library’s standard.
Just Update the Powder Room Bath
For this Greenwood Village powder room remodel we kept everything in its place. Created a custom vanity base and mirror frame. We then painted it “Lemon Twist”
Please Update the Master Bathroom
This Centennial master bathroom was in good shape but needed to be brought out of the 70’s. Change the cabinetry from oak to cherry, replace the tile countertops
This Guest Bath was Not Right
For this long and narrow Cherry Hills Village bath remodel we were able to add a second sink simply by reversing the swing of the door. Lift the existing cabinets to 34-1/2
One Boring Bathroom
This Centennial master bathroom was just plain boring. We kept everything in its place but significantly enhanced the tile work, cabinets and countertops.
Can You do that to Tile?
The incredible part of this Greenwood Village master bath remodel is its tile work. We had two different stones laser cut to embed the fleur-de-lis
(c) 2008 - 2012 Da Vinci Remodeling. All rights reserved. | Web Design by Creative Crazy
